Homepage » NHPC Recruitment 2017 Apprentice (Rangit Power Station)Post Views: 1943

National Hydroelectric Power Corporation (NHPC) is inviting applications to fill up the vacant posts of Apprentice at Rangit Power Station, Sikkim. Eligible candidates may apply online up to 28.07.2017. More details like qualification criteria, selection process & how to apply are available below…

NHPC Vacancy Details:

  • Apprentice
    » Electrician-02
    » Mechanic-02
    » Fitter-02
    » Wireman-01
    » Plumber-01
    » Welder-02
    » Computer Operator & Programme Assistant-01
    » Pump Operator-01
    » Machinist-01

Click here to view Sarkari Naukri latest list…

Age Limit: minimum age limit is 18 years and maximum 30 years as on 28.07.2017. Relaxations or reservation shall be given as per existing rules and regulations.

Qualification: Certificate in concern trade/stream from a recognized ITI. Preference will be given to project affected families and project affected areas of Rangit Power Station, Sikkim.

Selection Criteria: Eligible candidates as per requirement will be shortlisted on the basis of merit list prepared with marks secured in minimum qualification required for respective trade and ITI course. There will be no interview. Out of 100, 30% marks will be reserved for Minimum Requisite Qualification and 70% for ITI certificate.

How to Apply: The candidates will have to register themselves under NCVT MIS portal by visiting www.apprenticeship.gov.in & subsequently apply against NHPC Limited, Rangit Power Station, Sikkim for undergoing apprenticeship training on or before 28.07.2017. Candidates must upload their National trade certificate / Marksheets of all 4 semesters and proof of highest educational qualification as required.

Important Dates:

  • Starting date of application submission: 01 July 2017
  • Last date of application submission: 01 July 2017
  • Fees can be deposited: from 01.07.2017 to 01.08.2017

Click here to download Recruitment Advt

2 Comments on “NHPC Recruitment 2017 Apprentice (Rangit Power Station)

Leave a Reply

Your email address will not be published. Required fields are marked *